Product Description
Machine Features
Proportional oil system design,good stability,stable conversion,low failure rate,reliable ,easy to use and safe.
The whole machine body has sufficient rigidity,wear resistance,good guiding accuracy and stability.
Cooperate with the injection device to realize four-stage injection speed and injection pressure,and three-stage holding pressure.
It can meet the requirements of different rubber materials for injection conditions and has rapid production capacity.
Direct pressure structure with fast closing cylinder on both sides in vertical direction.
Two small oil cylinders to achieve fast opening and closing,speed and pressure divided into three digital settings;
The parallelism between upper and lower hot plates is less than 0.08mm.
A master cylinder to achieve clamping force,clamping pressure can be set.
Maximum closing pressure protection.
Precision electronic ruler controls the mode-locking stroke.
Low speed and low pressure controls protect mold safety settings until mold closing is in place.
Detailed Photos
Product Parameters
Type |
ZJBH-200T |
ZJBH-300T |
ZJBH-400T |
ZJBH-300T |
ZJBH-500T |
ZJBH-650T |
ZJBH-1000T |
ZJBH-2000T |
Injection volumn (cc) |
2500 |
4000 |
4000 |
4000-6000 |
10000-15000 |
10000-20000 |
25000 |
50000 |
Injection pressure (bar) |
1880 |
1800 |
1820 |
1880 |
1450 |
1470 |
1388 |
1388 |
Clamping force (Ton) |
200 |
300 |
400 |
300 |
500 |
650 |
1000 |
2000 |
Heating plate dimension (mm) |
560*600 |
700*700 |
800*800 |
630*1300 |
630*1600 |
720*1800 |
800*2600 |
1000*2600 |
Opening stroke (mm) |
500 |
550 |
600 |
550 |
600 |
700 |
1100 |
1200 |
Minimum mold thickness (mm) |
60 |
60 |
110 |
ADJUSTABLE |
Total power (kw) |
33 |
45 |
55 |
45 |
85 |
95 |
120 |
180 |
Machine size (m) |
3.5*1.7*2.7 |
3.7*1.8*3 |
5.7*1.8*3 |
3.7*1.7*2.7 |
6.2*2.5*3.7 |
6.4*3.3*3.2 |
3.7*1.7*2.7 |
3.7*1.7*2.7 |
Whole weight (Ton) |
7.5 |
9.5 |
12 |
9.5 |
20 |
24 |
45 |
60 |
Certifications
Packaging & Shipping
Installation Instructions
FAQ
Q1: Where is your factory located?
A1: Hunan Zhongjun Technology Co.,LTD is located at Jinlong High-tech industrial zone ,Yueyang City ,Hunan Province, China
Q2: Are you an integrated supplier for rubber machine ?
A2: Yes, we can provide the complete solution line to customer according to customer's requirement.
Q3: How about the quality control in your factory?
A3: Zhongjun has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 48 TO 72 hours and must be inspected carefully before shipment.
Q4: Will you offer the pre-sales service?
A4: Yes, we have an experienced pre-sales team to support customers not only including machine, technology also water .electrical, machine layout in factory, etc.
Q5: What about the after-service? Will you send your engineer to my country to help commission and install the machine?
A5: Surely, we have many experience technical engineers for oversea service, they would help you install machine and support training to workers also.
Q6: What is the delivery time of the machine?
A6: Actually, the delivery time of the machines is depended on the machine options. Normally, the delivery time of standard machine could be within 20-50 days.
Q7 : What is the warranty of the machine ?
A7: The whole machine's warranty period is 12 months and key parts will be depended.
Q8 : Do you provide any spare parts with machine?
A8: Yes, Zhongjun will provide one set standard spare parts to customer according to different machines.
Our Advantages:
We are own factory,so we make all the machine parts by ourselves, Besides, you can get the customize service with your requirements,At present, we have established strong business relations with domestic and international customers. Persisting in the aim of "striving for existence by quality and striving for development by sincerity ", we sincerely hope to enter into friendly cooperation with customers on the basis of superior quality, competitive prices and excellent after-sales service, striving for joint resplendence.warmly welcome to our factory !
After-sales service:
1-Quality guarantee period:Within 12 months,During this period,if there are troubles with machines,the manufacturer should send engineers to repair or replace the spare part if needed.
2-According to demand of buyer,the supplier send engineers to guide the install and the debug.But the buyer should undertake all cost,such as ticket,food,hotel for supplier,also they need pay 200 USD for engineer one day.
3-For the damage caused by the buyer,supplier provides the spare part and repair it with the best price.
4-If machine is broken up due to the not correct of the buyer within the one year period,supplier can send engineers if need to assist buyer,but buyer should undertake all the cost.
5-Within one year guarantee period,if machine broken down due to its quality itself,supplier should solve this for buyer with its cost.
6-Two parties can discuss other items which are not mentioned in this place.