Customization: | Available |
---|---|
After-sales Service: | 48 Hours |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine Features
Proportional oil system design,good stability,stable conversion,low failure rate,reliable ,easy to use and safe.
The whole machine body has sufficient rigidity,wear resistance,good guiding accuracy and stability.
Cooperate with the injection device to realize four-stage injection speed and injection pressure,and three-stage holding pressure.
It can meet the requirements of different rubber materials for injection conditions and has rapid production capacity.
1, Double motor double pump double hydraulic system design, two stations independent control, independent operation, when the two stations curing time and take the product time staggered, only one operation, equivalent to one person to operate two machines;
2, The front top clamping clamping mechanism, the mold is opened in front of the machine, easy to take products;
3, The use of high vacuum vacuum cover design, can make the mold in a nearly complete vacuum environment, improve the mold exhaust performance;
4, The countertop installation mold ventilation spring is strong, with vacuum system, no bubbles form high-quality products;
5, Vacuum cover in 4 seconds to complete the vacuum of more than -650mmHG, easy to form, the requirements of the finished product is the most suitable;
6, The machine has complete functions, suitable for repeated mold and a variety of mold structure, needle and thimble optional equipment;
7, The unit area clamping force is large, to ensure that the mold seamless splicing tight, the product no flash, good quality.
Suitable product
Industrial rubber/Medical /Lifestyle/Aerospace/Auto motives parts/Seals
Type | ZJC-200T | ZJC-250T | ZJC-300T | ZJC-350T | ZJC-400T |
Clamping force (Ton) | 200 | 250 | 300 | 350 | 400 |
Heating plate dimension (mm) | 560*600 | 650*600 | 650*700 | 700*700 | 800*800 |
Opening stroke (mm) | 300 | 300 | 300 | 350 | 400 |
Main cylinder diameter(mm) | 360 | 400 | 450 | 475 | 520 |
Motor power (kw) | 7.5*2 | 7.5*2 | 7.5*2 | 11*2 | 11*2 |
Heating power (kw) | 16.4*2 | 19.8*2 | 24*2 | 24*2 | 31.2*2 |
Pump rate speed ( Cubic meter/h) | 100 | 100 | 200 | 200 | 200 |
Molding opening form | Rise And Fall-Mold In And Out -Double Layer Open Mold-Front Top Open Mold(Multi Layer Open Mold) | ||||
Machine size (m) | 3.5*2.4*2.2 | 3.8*2.5*2.2 | 4.2*3.6*2.3 | 4.5*2.7*2.5 | 5*2.9*2.6 |
Whole weight (Ton) | 10 | 12 | 14 | 16 | 20 |
Hunan Zhongjun Technology Co., Ltd is located in Yue yang city, Hunan province, China, covers an area of 100000 square meters. Our company was established since 1993 and founded by a group of professional engineers who are well experience in rubber & silicone machinery manufacturing. To meet our customers' requirements, we have been adhering to design innovation, quality first and also provide custom made service.warmly welcome to visit our factory !
After sales service
1-Quality guarantee period:Within 12 months,During this period,if there are troubles with machines,the manufacturer should send engineers to repair or replace the spare part if needed.
2-According to demand of buyer,the supplier send engineers to guide the install and the debug.But the buyer should undertake all cost,such as ticket,food,hotel for supplier,also they need pay 200 USD for engineer one day.
3-For the damage caused by the buyer,supplier provides the spare part and repair it with the best price.
4-If machine is broken up due to the not correct of the buyer within the one year period,supplier can send engineers if need to assist buyer,but buyer should undertake all the cost.
5-Within one year guarantee period,if machine broken down due to its quality itself,supplier should solve this for buyer with its cost.
6-Two parties can discuss other items which are not mentioned in this place.
Q1: Where is your factory located?
A1: Hunan Zhongjun machine co.,LTD is located at Jinlong High-tech industrial zone ,Yueyang city, Hunan Province China.
Q2: Are you an integrated supplier for rubber machine ?
A2: Yes, we can provide the complete solution line to customer according to customer's requirement.
Q3: How about the quality control in your factory?
A3: Hunan Zhongjun has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 48 TO 72 hours and must be inspected carefully before shipment.
Q4: Will you offer the pre-sales service?
A4: Yes, we have an experienced pre-sales team to support customers not only including machine, technology also water .electrical, machine layout in factory, etc.
Q5: What about the after-service? Will you send your engineer to my country to help commission and install the machine?
A5: Surely, we have many experience technical engineers for oversea service, they would help you install machine and support training to workers also.
Q6: What is the delivery time of the machine?
A6: Actually, the delivery time of the machines is depended on the machine options. Normally, the delivery time of standard machine could be within 20-50 days.
Q7 : What is the warranty of the machine ?
A7: The whole machine's warranty period is 12 months and key parts will be depended.
Q8 : Do you provide any spare parts with machine?
A8: Yes, HUNAN Zhongjun will provide one set standard spare parts to customer according to different machines.