Customization: | Available |
---|---|
After-sales Service: | Within 48 Hours |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.The first trap of the first-in first-out injection system with self-cleaning function.
2.The back pressure is consistent during measurement and the injection accuracy is high.
3.Brand new colour high-definition touch screen.
4.The new Simens editable operating system allows free editing of device actions.
Suitable product:
Industrial product /Medical/Life style /Aerospace/Automotive parts/Seals
Direct pressure structure with fast closing cylinder on both sides in vertical direction,Two small cylinders for fast opening and closing, speed and Pressure can be set;Four-column type, single machine type;A master cylinder to achieve clamping force, clamping pressure can be set;Maximum Clamping pressure protection;Precision electronic ruler controls the mode-locking stroke;Before clamping in place, low speed and low pressure Control protects mold safety Settings;The mode shift direction is equipped with safety grating.
Type | ZJAX-200T | ZJAX-300T | ZJAX-400T |
Injection Volume (CC) | 2500 | 4000 | 6000 |
Clamping Force (Ton) | 200 | 300 | 400 |
Heating Plate Dimension (mm) | 560*600 | 700*700 | 800*800 |
Opening Stroke (mm) | 500 | 550 | 600 |
Minimum Mold Thickness (mm) | 60 | 60 | 110 |
Total Power (Kw) | 33 | 45 | 55 |
Machine Size (M) | 2.8*1.3*3.5 | 3*1.5*4.3 | 3.5*1.5*4.7 |
Whole Weight (Ton) | 7 | 9 | 12 |
Our Advantages:
We are own factory,so we make all the machine parts by ourselves, Besides, you can get the customize service with your requirements,At present, we have established strong business relations with domestic and international customers. Persisting in the aim of "striving for existence by quality and striving for development by sincerity ", we sincerely hope to enter into friendly cooperation with customers on the basis of superior quality, competitive prices and excellent after-sales service, striving for joint resplendence.warmly welcome to our factory !
1-Quality guarantee period:Within 12 months,During this period,if there are troubles with machines,the manufacturer should send engineers to repair or replace the spare part if needed.
2-According to demand of buyer,the supplier send engineers to guide the install and the debug.But the buyer should undertake all cost,such as ticket,food,hotel for supplier,also they need pay 200 USD for engineer one day.
3-For the damage caused by the buyer,supplier provides the spare part and repair it with the best price.
4-If machine is broken up due to the not correct of the buyer within the one year period,supplier can send engineers if need to assist buyer,but buyer should undertake all the cost.
5-Within one year guarantee period,if machine broken down due to its quality itself,supplier should solve this for buyer with its cost.
6-Two parties can discuss other items which are not mentioned in this place.
Q1: Where is your factory located?
A1: Hunan Zhongjun Technology Co.,LTD is located at Jinlong High-tech industrial zone ,Yueyang City ,Hunan Province, China