Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover

Product Details
Customization: Available
After-sales Service: 48 Hours
Warranty: 12 Months
Manufacturer/Factory & Trading Company
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (28)
  • Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
  • Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
  • Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
  • Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
  • Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
  • Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Packaging & Shipping
  • Company Profile
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
ZJC 200-400 T
Certification
CE, ISO
Condition
New
Customized
Customized
Automatic Grade
Automatic
Structure
Horizontal
After-Sales Service Provided4
Engineers Available to Service Machinery Overseas
Safety Cover
with Full Safety Cover
After-Sales Service Provided2
Online Support
Key Selling Points
Easy to Operate
Safety Device
Safety Curtain
After-Sales Service Provided3
Video Technical Support
Clamping Force
500t (Adjustable)
Machinery
Suitable for Special Shaped Products
Transport Package
Simple Packing or as Customer Request
Specification
4.3*2.85*2.7
Trademark
Zhongjun
Origin
Hunan China
HS Code
8501109101
Production Capacity
800 Set /Per Year

Product Description

Product Description

1.Propotional oil system design,good stability,stable conversion,low failure rate,reliable,easy to use and safe.
2.The high-precision steel structure of the access template is ground and nitried to achieve a high-precision platform surface.
3.The body of the whole equipment has sufficient rigidity ,wear resistance,good guiding accuracy and stability,
4.Vacuum pump,2XZ-15D-15L/S,vacuum degree up to less than or equal to 0.1,suitable for various two-layer or multi-layer molds,with rapd production capacity.

Suitable product
Industrial rubber/Medical/lifestayle/Auto parts

Detailed Photos
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover

 

Product Parameters
Type   ZJC-200T   ZJC-250T  ZJC-300T   ZJC-350T  ZJC-400T
Clamping force (Ton) 200 250 300 350 400
Heating plate dimension (mm)  560*600 650*600 650*700 700*700 800*800
Opening stroke (mm) 300 300 300 350 400
Main cylinder diameter(mm) 360 400 450 475 520
Motor power (kw) 7.5*2 7.5*2 7.5*2 11*2 11*2
Heating power (kw) 16.4*2 19.8*2 24*2 24*2 31.2*2
Pump rate speed ( Cubic meter/h) 100 100 200 200 200
Molding opening form  Rise And Fall-Mold In And Out -Double Layer  Open Mold-Front Top Open Mold(Multi Layer Open Mold)
Machine size (m) 3.5*2.4*2.2 3.8*2.5*2.2 4.2*3.6*2.3 4.5*2.7*2.5 5*2.9*2.6
Whole weight (Ton) 10 12 14 16 20
Certifications
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover

 

Packaging & Shipping
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover
Fully Automatic 400t Rubber Silicone Vacuum Vulcanizing Molding Machine with Safety Cover

 

Company Profile

The mode-locking part
Direct pressure structure with fast closing cylinder on both sides in vertical direction;
Two small cylinders for fast opening and closing, speed and pressure can be set;

Parallelism between upper and lower templates <=0.05mm ;
Two master cylinders to achieve clamping force, clamping pressure can be set;
Maximum clamping pressure protection;
Up-moving vacuum cover, two vacuum plungers front and rear layout, greater force area;
Before clamping in place, low speed and low pressure control protects mold safety Settings;


Hot plate section
Hlectric heating

High temperature, high pressure insulation board;


Hydraulic system
Highly energy efficient fully matched hydraulic systems;
Hydraulic directional valve, double proportional control;
No power mode locking and pressure preservation;
Complete identification of all oil circuits;
High precision high pressure vane pump ;
Automatic pressure refill function;


Electrical parts
Control system for the world famous industry special Siemens PLC;
10 inch color LCD display;
English button operational panel;
Computer piping and instruments diagram,temperature control accuracy is ± 3 degree;
The function can be controlled by selecting or not using some machine sequence, exhaust action, vulcanization stop, automatic mold opening, mold shifting and other actions, optional;
The electric box is equipped with AC220V/6A multifunctional socket, which can be used for lighting and maintenance According to Chinese standards;
Have manual function,automatic control function ,each function does not interfere with each other ,and some specific functions can be manually controlled in automatic state,which is easy to operate on site;
50 sets of mold data memory and storage ,support English letters input;
Product production information statistics function.
Various information display and alarm.
The operating surface equipped with safety grating;
Three color alarm display light.


Other request
Label assembly
Tank cooling Water cooling by default, can be changed to air cooling according to requirements
Machine appearance, painting, according to the requirements of the demander color matching provided;
Customer request
Site foundation conditions

The device must be installed directly on the concrete floor or secured by anchor bolts.
The installation site must meet the following conditions
Foundation stress :greater than 100KN/square meter
Concrete compression strength greater than 1750 square meter
Concrete depth : greater than 120 mm
Note:if the foundation of the factory device does not meet the requirement,it is recommended to lay steel plate on the ground;

Warmly welcome to our factory !

After Sales Service

1-Quality guarantee period:Within 12 months,During this period,if there are troubles with machines,the manufacturer should send engineers to repair or replace the spare part if needed.
2-According to demand of buyer,the supplier send engineers to guide the install and the debug.But the buyer should undertake all cost,such as ticket,food,hotel for supplier,also they need pay 200 USD for engineer one day.
3-For the damage caused by the buyer,supplier provides the spare part and repair it with the best price.
4-If machine is broken up due to the not correct of the buyer within the one year period,supplier can send engineers if need to assist buyer,but buyer should undertake all the cost.
5-Within one year guarantee period,if machine broken down due to its quality itself,supplier should solve this for buyer with its cost.
6-Two parties can discuss other items which are not mentioned in this place.

 

FAQ

Q1: Where is your factory located?

A1: Hunan Zhongjun Technology Co.,LTD is located at Jinlong High-tech industrial zone ,Yueyang City ,Hunan Province, China

 

Q2: Are you an integrated supplier for rubber machine ?

A2: Yes, we can provide the complete solution line to customer according to customer's requirement.

Q3: How about the quality control in your factory?

A3: Zhongjun has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 48 to 72 hours and must be inspected carefully before shipment.

Q4: Will you offer the pre-sales service?

A4: Yes, we have an experienced pre-sales team to support customers not only including machine, technology also water .electrical, machine layout in factory, etc.

Q5: What about the after-service? Will you send your engineer to my country to help commission and install the machine?

A5: Surely, we have many experience technical engineers for oversea service, they would help you install machine and support training to workers also.

 
Q6: What is the delivery time of the machine?

A6: Actually, the delivery time of the machines is depended on the machine options. Normally, the delivery time of standard machine could be within 20-50 days.

Q7 : What is the warranty of the machine ?

A7: The whole machine's warranty period is 12 months and key parts will be depended.

Q8 : Do you provide any spare parts with machine?

A8: Yes, Zhongjun will provide one set standard spare parts to customer according to different machines.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier